SMA Sunny Island 2012 Technical Description page 133

Stand-alone grid inverter
Table of Contents

Advertisement

SMA Solar Technology AG
After-run
Autostart generators can have an internal after-run which is activated after the request has
been disabled. This can extend the power down time accordingly.
Information
Some generator types connect voltage to the output only after the internal warm-up phase
has been completed. Therefore the time for the generator activation sequence is internally
monitored.
Time for connection = 10 minutes in the case of GenMan and/or 2 x "233.10
GnCoolTm" + 2 minutes for manual and autostart.
The following figure shows the wiring for a generator capable of autostart:
AC1
PE
PE N L
PE
N
Island Grid
L
If the generator is started manually in this operating mode, the Sunny Island detects the generator
running and connects it after the warm-up time. If you stop the generator externally, this is detected,
the generator is disconnected and the stand-alone grid continues to be powered.
Information
If a generator request is made during the generator operation which was started
externally, the GnReq signal is suppressed until the generator is stopped externally again
and the stop time has expired.
Technical Description
Sunny Island
Relay1
AC2
PE N L
Connecting External Sources
Start
Generator
L
N
PE
SI2012_2224-TEN082311
133