Operating the Sunny Island
Start the island grid system with the Sunny Remote Control 1
1.
Insert the NH fuse in the BatFuse or close the
BatFuse's DC disconnector.
2.
Press the DC start key on the Sunny Island
The Sunny Island is switched on
3.
The Sunny Island initiates the startup phase.
Wait for the following displays to finish.
4.
"To init system hold <Enter>" is displayed after the
startup phase.
5.
If you want to go into the QCG, press and hold
the Sunny Remote Control 1's pushbutton.
Instructions on how to proceed further can be
found in chapter 9.2 "Starting the Quick
Configuration Guide (QCG)" (Page 76).
If you do not press the pushbutton within 5
6.
seconds, the Sunny Island skips the QCG.
The following message appears:
„ST(A)NDBY: To Start INV(erter) hold <Enter>"
84
SI2012_2224-TEN082311
SMA Solar Technology AG
HSI2012BFSBOOT V1.002
SI2224
@SMA 2007
To init system
hold <Enter>
STNDBY: To Start
INV hold <Enter>
Technical Description