Table 9-3:
Code
1
3
5
8
12
13
14
15
Other
9.2.5
Schedule automatic execution of the SMV test
You can set up and run a single test at a user-defined future time. You can also set up and
run tests on a regular schedule.
Manage scheduled test execution using the display
1.
Configuration and Use Manual
SMV abort codes
Description
User-initiated abort
Frequency drift
High drive gain
Unstable flow
There is a fault present and
SMV cannot run
No factory reference data for
meter verification test per-
formed on air
No factory reference data for
meter verification test per-
formed on water
No configuration data for
meter verification
General abort
Navigate to the Smart Meter Verification menu.
Recommended actions
None required. Wait 15 seconds before starting an-
other test.
Ensure that temperature, flow, and density are sta-
ble, and rerun the test.
Ensure that flow is stable, minimize entrained gas,
and rerun the test.
Check factors that could cause process instability,
then rerun the test. To maximize process stability:
•
Maintain a constant fluid pressure and tempera-
ture.
•
Avoid changes to fluid composition, such as
two-phase flow or settling.
•
Maintain a constant flow rate.
View the Alerts present on the device and take any
necessary actions to clear them.
Contact customer service.
Contact customer service.
Contact customer service.
Repeat the test. If the test aborts again, contact
customer service.
Measurement support