3. Commissioning
3.2
Procedure for commissioning
3-12
In order to avoid connecting and configuration errors, com-
missioning in steps is required.
Proceed as follows:
1. Check the CTEL master module and the connected I-port
device (see section 3.3).
2. Determine the configuration presetting used (see sec-
tion 1.4.1).
3. If required: parameterisation of the CTEL master module
and the I-port device (see section 3.6).
4. Check voltage supplies (see section 2.5).
5. Commission the entire system.
1)
See description for the respective CPX fieldbus master
1)
Festo P.BE-CPX-CTEL-EN en 1205NH