11 Operating Data and Parameters
Name
Description
PvVtgRisoDif
Differential voltage to
PvVtgStrLevMin for
switching from insulation
measurement to feed-in
operation
IsoDev*
Selection of insulation
monitoring device
* To view or change this parameter, you must enter the installer password.

11.2.1.5 Project-Specific Parameters

Name
Description
PvPwrMinTr
Threshold for starting the
MPP tracker
PvPwrMinTrT
Timeout for starting the
MPP tracker
PvVtgStr-
Threshold for switching
LevMin*
to feed-in operation
PVStrT
Once the specified time
has elapsed, the inverter
switches from the operat-
ing state "Grid monitor-
ing" to the operating
state "Grid monitoring
time reached".
VArGra**
Gradient of reactive
power change
QoDIn-
Maximum allowed re-
vCurPv***
verse current to the PV
array
138
SCCPXT-E7-BA-en-58
Value/range
Explanation
−250 V to +250 V
isoPV3
isoPV1685
Value/range
Explanation
0 kW to 20 kW
1 s to 1,800 s
0 V to 1,200 V
Sunny Central 500CP XT
0 V to 1,200 V
Sunny Central 630CP XT
0 V to 1,200 V
Sunny Central 720CP XT
0 V to 1,200 V
Sunny Central 760CP XT
0 V to 1,200 V
Sunny Central 800CP XT
0 V to 1,200 V
Sunny Central 850CP XT
0 V to 1,200 V
Sunny Central 900CP XT
0 V to 1,200 V
Sunny Central 1000CP XT
1 s to 655 s
0%/s to 200%/s
−1,600 A to 0 A
SMA Solar Technology AG
Default
value
0 V
isoPV3
Default
value
20 kW
600 s
500 V
610 V
630 V
660 V
705 V
760 V
770 V
770 V
90 s
20%/s
−60 A