Timing Pulley D Attachment - Brother NX600 Service Manual

Computerized sewing machine
Hide thumbs Also See for NX600:
Table of Contents

Advertisement

Main unit
1
Assembling the Lower shaft A assembly
1. Attach retaining ring E6 to lower shaft A.
2. Attach the thrust washer 1, lower shaft bushing 2, thrust washer 1 and
set screw collar 3 (Face the ground surface toward the lower shaft
bushing).
3. Move the set screw collar 3 to the right and secure it with the screws 1
(two).
Start movie clip (CD-ROM version only)
1
2

Timing pulley D attachment

1. Attach retaining ring E6 to lower shaft A.
2. Attach timing pulley D 1 to lower shaft A, and attach retaining ring E6.
3. Hand start the screws 1 (three) in timing pulley D 1.
(Fully tighten after 4 - 8 "Needle bar rise adjustment".)
*Key point
• With the lower shaft A D cut 2 facing forward, secure using
one of the three screw holes in timing pulley D 1 in the
forward facing position.
Start movie clip (CD-ROM version only)
1
3
Joint attachment
1. Put the lower shaft bushing 1 on the lower shaft A assy.
2. Put the joint 2 on the lower shaft A assy., and hand start the screws 1
(two) (fully tighten after 3 - 10 "6 feed module attachment.)
*Key point
• Align the screw hole 3 in the joint with the D cut 4 in lower
shaft A.
Start movie clip (CD-ROM version only)
1
3 - 8
Rotary hook drive mechanism / Feed and bobbin
mechanism /Cutter assy.
Set Screw, Socket (CP)
M4X4
Color; Black
Set Screw, Socket (FT)
M5X5
Color; Black
Set Screw, Socket (FT)
M5X5
Color; Black
Torque
1.47 – 1.98 N·m
3
Torque
Hand tighten
2
Torque
Hand tighten
1
2
Retaining ring E6
1
Retaining ring E6
Retaining ring E6
Face forward
2
1
1 (two)
3
4
1
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents