■Operation
Outline operation between CPUs at the MP.CHGV and DP.CHGV instruction execution is shown below.
• MP.CHGV instruction
Sequence program
MP.CHGV instruction
Request data set
CPU dedicated transmission
(Non-fixed cycle)
Speed change
Complete device (D1+0)
Status display device (D1+1)
at the completion
• DP.CHGV instruction
Sequence program
DP.CHGV instruction
CPU dedicated transmission
(Fixed cycle)
Communication
cycle
Speed change
Complete device (D1+0)
Status display device (D1+1)
at the completion
*1 Set in [System Parameter] [Multiple CPU settings] in GX Works3
■Setting of axis to execute the speed change
The axis to execute the speed change set as (S1) sets J + axis No. in a character " ".
Motion CPU
R64MTCPU
R32MTCPU
R16MTCPU
The number of axes which can set are only 1 axis. Set "J" in a capital letter or small letter and use the axis No. set in the servo
network setting as the axis No. to start. Refer to the following for servo network settings.
MELSEC iQ-R Motion controller Programming Manual (Common)
MP.CHGV execution
ON
Transfer
Response
data set
DP.CHGV execution
ON
Request data set
Transfer
Transfer
Response
data set
*1
(S1) usable range
1 to 64
1 to 32
1 to 16
END
END
Speed change processing
ON
ON: Abnormal completion only
1 scan
END
END
Speed change processing
ON
ON: Abnormal completion only
1 scan
2 MOTION DEDICATED PLC INSTRUCTION
2.2 Motion Dedicated PLC Instruction
2
61