Installing The Server; Optional Components - Oracle Netra SPARC S7-2 Installation Manual

Hide thumbs Also See for Netra SPARC S7-2:
Table of Contents

Advertisement

Installing the Server

These topics describe how to install the server into an equipment rack.
Step
1.
2.
3.
4.
Related Information
"Understanding the Server" on page 11
"Confirming Specifications" on page 17
"Preparing for Installation" on page 27
"Connecting Cables" on page 61
"Powering On the Server for the First Time" on page 71

Optional Components

Optional components, such as additional memory or PCIe cards that were ordered as part of
the server, are installed in the server at the factory before the server is shipped. Any options
not ordered with the server are shipped separately. If possible, install these components prior to
installing the server in a rack.
Description
Install optional components.
Review cautions.
Stabilize the rack.
Install the server in a rack.
Links
"Optional Components" on page 31
"Handling Precautions" on page 28
"Stabilize the Rack" on page 33
"Installing the Standard 19-Inch Hardmount Kit (4-Post
Rack)" on page 33
"Installing the 19-Inch Sliding Rail Kit With the
CMA" on page 40
"Installing the 19-Inch Hardmount Kit (2-Post
Rack)" on page 51
Installing the Server
31

Advertisement

Table of Contents
loading

Table of Contents