Oracle Netra SPARC S7-2 Installation Manual page 73

Hide thumbs Also See for Netra SPARC S7-2:
Table of Contents

Advertisement

4.
Position and align the grounding lug on the two grounding studs at the rear of
the chassis.
No.
Description
1
Earth ground cable secured in the grounding lug
2
M5 nuts
5.
Secure the grounding lug to the grounding studs using the two M5 nuts.
Secure the other end of the grounding wire to the earth ground in the building.
6.
You can secure the grounding wire to a proper grounding point on the rack, as long as the rack
is properly grounded to the earth ground in the building.
7.
Consider your next step:
Connect the AC input power cord.
See
Assemble the DC input power cord.
See
"Assemble the DC Input Power Cords" on page
Connect the Chassis Ground Wire
76.
Powering On the Server for the First Time
73

Advertisement

Table of Contents
loading

Table of Contents