Installing the Server

These topics describe how to install the server into a rack equipped with square mounting holes.
If you are installing the server into a rack equipped with round mounting holes, see
Correct Rackmount Hardware" on page
If the rackmount kit came with its own instructions, use those instructions instead of the
Note -
instructions in this chapter. After performing the server installation, proceed to
the Server for the First Time" on page 65
Step
Description
1.
Ensure that your rack is compatible with the
server requirements.
2.
Determine the correct rackmounting hardware
and install the hardware.
3.
Install the server in the rack.
4.
(Optional) Install the CMA.
5.
(Optional) If you are installing the server into
a rack that will be shipped to another location,
install the shipping brace assembly.
6.
Review cabling requirements and port
information. Attach data and management
cables to the server.
7.
Configure the Oracle ILOM SP and power on
the server for the first time.
Related Information
"Understanding the Server" on page 11
"Tools Needed for Installation" on page 26
"Connecting Cables" on page 51
35.
for first-time power on.
Links
"Rack Compatibility" on page 30
"Determine Correct Rackmount
Hardware" on page 35
"Mark the Rackmounting Location" on page 36
"Install the Shelf Rails" on page 37
"Install the Server" on page 39
"Installing the CMA (Optional)" on page 41
"Installing the Shipping Brace Assembly
(Optional)" on page 45
"Connecting Cables" on page 51
"Powering On the Server for the First
Time" on page 65
"Determine
"Powering On
Installing the Server