19-Inch Hardmount Rack Kit (2-Post Rack) Components - Oracle Netra SPARC S7-2 Installation Manual

Hide thumbs Also See for Netra SPARC S7-2:
Table of Contents

Advertisement

Installing the 19-Inch Hardmount Kit (2-Post Rack)
19-Inch Hardmount Rack Kit (2-Post Rack)
Components
No.
1
2
3
Related Information
"Install the Server (2-Post, 19-Inch Hardmount Rack Kit)" on page 53
"Tools Needed for Installation" on page 29
"Handling Precautions" on page 28
"Rack Cautions" on page 32
52
Netra SPARC S7-2 Server Installation Guide • January 2017
Description
Rear plates (2)
Screws
Side brackets (2)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Netra SPARC S7-2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents