Oracle Netra SPARC S7-2 Installation Manual page 100

Hide thumbs Also See for Netra SPARC S7-2:
Table of Contents

Advertisement

Index
ESD, 29
preparing
server for installation, 27
R
rack
cautions, 32
stabilizing, 33
rackmounting
2-post
19-inch hardmount, 52
4-post 19-inch sliding rails with CMA, 41
installing 4-post 19-inch sliding rails with
CMA, 42
installing 4-post hardmount kit, 36
rear panel
components, 15
relative humidity, 22
requirements
cabling, 61
elevation, 22
environmental, 22
Ethernet cables, 64
grounding, 21
lightning, 61
overcurrent protection, 20
tools, 29
restricted-access location, 21
S
SAS drive slots, 14
screwdriver, 29
SER MGT port, 15, 61, 64, 66
initial power on, 81
serial connection, 61
serial terminal settings, 81
server
applying DC power, 80
confirming site and server specifications, 17
depth, 17
features, 12
100
Netra SPARC S7-2 Server Installation Guide • January 2017
height, 17
increase performance, 85
installing, 31
lifting cautions, 28
models, 14
overview, 12
understanding, 11
weight, 17
width, 17
service processor
show command, 92
Service Required LED, 14, 15
shipping kit inventory, 27
show /SP/network command, 92
show command, 92
site specifications, 17
sliding rail kit, installing, 40
SP, 12
cabling, 64
specifications
DC input treatment, 18
elevation, 22
frequency, 18
humidity, 22
input current, 18
physical, 17
power supplies, 18
site, 17
temperature, 22
voltage, 18
stabilizing the rack, 33
standby
mode, 74
status indicators
front panel, 14
rear panel, 15
stop bit, 81
storage supported, 12
stripping DC wires, 76
supported, 12
cooling fans, 12
Ethernet ports, 12
optical media, 12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Netra SPARC S7-2 and is the answer not in the manual?

Table of Contents