Install the Server (4-Post, 19-Inch Hardmount Rack
Kit)
Caution -
19-inch hardmount kit. If you deviate from these instructions when installing the server, your
installation will not be supported.
1.
Gather the required tools.
See
"Tools Needed for Installation" on page
Read the server cautions.
2.
See
"Handling Precautions" on page 28
3.
Read the rack cautions and stabilize the rack.
See
"Rack Cautions" on page 32
If you are changing the rack kit on an existing server in your data center, perform
4.
these steps:
Shut down the server, and remove the power and data cables.
a.
b.
Remove the server from the rack, and place it on an antistatic mat.
c.
Remove the existing mounting brackets from the server and rack, if
applicable.
5.
Secure the hardmount brackets to the sides of the server.
36
Netra SPARC S7-2 Server Installation Guide • January 2017
You must install the server into a rack following these instructions for the 4-post,
and
29.
and
"ESD Precautions" on page
"Stabilize the Rack" on page
29.
33.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Netra SPARC S7-2 and is the answer not in the manual?

Table of Contents