3.2 HUMAN-MACHINE INTERFACE (HMI)
Esc: Menu.
The meaning of these options is as follows:
Esc: Menu.
Press the ESC key to access the relay main menu, similar to the one displayed by the text-display model (F650B).
Press the ESC key again and the menu selection screen (Actual Values, Snapshot events, etc.) is displayed. This main menu
screen is identical to the one described for the text display, with functionality described in section 3.2.6 Text menus.
Intro: Next.
Press the enter/shuttle key to access the next graphical screen, which in this case corresponds to the primary metering
values screen.
: Select
Once the different switchgear elements have been configured using EnerVista 650 Setup, they can be operated from the
graphic display.
If a single-line diagram has been configured in the EnerVista 650 Setup software, in the HMI option inside the Relay
Configuration menu, the different switchgear elements configured for the display are operative from the graphic display.
By pressing the up-down key or rotating the shuttle key to the left and right, the cursor moves among the elements and
blinks on each of them. When an element is selected by pressing the enter/shuttle key, the relay indicates the command
to be executed, and the user needs to confirm by pressing the enter/shuttle key.
The following sections describe only the operation of screens that are specific for the graphic display models.

3.2.7.2 Metering screen

The Metering screen displays relay analog measures in their primary values. Available metering values are as follows:
As in the rest of graphical display screens, the bottom part shows a legend that indicates the possible options for the user.
In this case, the options are:
Enter: Next.Esc: Prev.
Intro: Next.
Pressing the enter shuttle key the user accesses the next screen, in this case the ALL EVENTS screen.
Esc: Prev.
Pressing the ESC key the user returns to the previous screen (One-line diagram)
: Scroll.
3-58
Enter: Next.
Metering Screen.
Phasor Ia Primary
Phasor Ib Primary
Phasor Ic Primary
Phasor Ig Primary
Phasor Isg Primary
RMS Ia Primary
RMS Ib Primary
RMS Ic Primary
RMS Ig Primary
RMS Isg Primary
I0 Primary
Enter: Next.
ESC: Prev
Figure 3-33: METERING SCREEN
: Scroll.
F650 DIGITAL BAY CONTROLLER
CHAPTER 3: INTERFACES, SETTINGS & ACTUAL VALUES
: Select.
Total metering 53
0.000 KA
0.000 KA
0.000 KA
0.000 KA
0.000 KA
0.000 KA
0.000 KA
0.000 KA
0.000 KA
0.000 KA
0.000 KA
:Scroll.