Washing all the ISE lines

Materials required:
2 clean, empty buffer bottles
Probe Wash 3 solution
Dummy electrode
Phillips head screwdriver
Time: 15 minutes
Analyzer mode: Manual operation
1. At the Menu Panel, select
2. In the Period.wash area, select
3. Open the front doors and replace the buffer solution (
containing 500 mL of deionized water.
Figurer 5-36. Location of ISE Buffer bottle
4. Loosen the thumb screw and lift the ISE cover.
5. Disconnect the electrode connectors.
6. Remove the thumbscrew (
block containing the electrode.
172
BIOHAZARD
Wear personal protective equipment.
Use universal precautions.
., then select
Maint
ISE Operation
, then select
OFF
Set
) to release the plate that secures the electrodes and the
1
.
.
1
) with another buffer bottle