Advanced commissioning
7.6 Basic positioner and position control
7.6.2

Commissioning sequence

We recommend that you commission the basic positioner using the "STARTER" tool.
Downloading: STARTER
(http://support.automation.siemens.com/WW/view/en/10804985/133200).
164
Assign encoders to the axes (Page 74)
Set the communication via the fieldbus (Page 87)
Optimize the speed control (Page 143)
Normalize the encoder signal (Page 165)
Set the axis traversing range (Page 172)
Optimizing the position controller (Page 174)
Set the positioning accuracy (Page 180)
Establish the reference to the machine zero point
(Page 185)
Setup the axis (Page 202)
Save and call the traversing blocks in the con-
verter (Page 205)
or
Enter a position setpoint from the external control
via fieldbus (Page 220)