Commissioning

5.1

Commissioning guidelines

The converter must match the motor and the drive application to be able to optimally operate
and protect the motor. We recommend a certain procedure when commissioning your
converter.
Converter with control units CU250D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
Explanation of the commissioning steps:
Preparing for commissioning
(Page 60)
Restoring the factory setting
(Page 82)
Basic commissioning with
STARTER (Page 69) orOperator
Panel (Page 65)
Adapt inputs and outputs
(Page 115)
Adapt fieldbus configuration
(Page 87)
Motor control (Page 143)
Basic positioner and position control
(Page 163)
Advanced commissioning
(Page 113)
Backing up data and series com-
missioning (Page 275)