Carry-Out Basic Commissioning - Siemens SINAMICS G120D Operating Instructions Manual

With control units cu250d-2
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Commissioning
5.4 Basic commissioning with a PC
5.4.4

Carry-out basic commissioning

Procedure
Proceed as follows to carry out basic commissioning:
1.
2.
3.
4.
5.
6.
74
Select the control mode.
See also Section: Introduction, V/f control, vector control (Page 62)
Select the I/O configuration to preassign the inverter interfaces.
The possible configurations can be found in sections: Factory settings
of the inputs and outputs (Page 51) and Default settings of inputs and
outputs (Page 52).
Set the applicable motor standard and the inverter supply voltage.
Select the application for the inverter.
• "[0] Load cycle with high overload for applications requiring a high
dynamic performance, e.g. conveyor systems.
• "[1] Load cycle with low overload ..." for applications that do not
require a high dynamic performance, e.g. pumps or fans.
• [6], [7]: Load cycles for applications with encoderless 1FK7
synchronous motors.
Select your motor.
Enter the motor data according to the rating plate of your motor.
If you have selected a motor based on its article number, the data has
already been entered.
Set the most important parameters to suit your application.
Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
Converter with control units CU250D-2