5. Slide the throttle and choke cables through cable tie
and position them into the r-clamp located on the left
side of the engine (Fig. 408).
Fig 408
6. Hook the throttle and choke cable z-bends into the
engine brackets (Fig. 409).
Note the marked cable and the marked bracket.
Fig 409
GT Series Tractors Service Manual
7. Place the throttle and choke cables into the cable
clamp. Tighten screw only enough to hold the cables
in place (Fig. 410).
PICT-7614
8. Remove the cable markers.
9. Raise the machine.
10. Align the engine mounting holes with the holes in
the frame. Install the 4 engine mounting bolts and
torque to 16 + 2 ft-lbs. (21.7 + 2.7 Nm) (Fig. 411).
PICT-7617
ENGINE
Fig 410
PICT-7596
Fig 411
PICT-7620
4
4-7