Hirschmann RS20 User Manual page 123

Hide thumbs Also See for RS20:
Table of Contents

Advertisement

Network load control
Workstation 1
Figure 32: Example of flow control
Flow control with a full duplex link
In the example
2 and the device.
Before the send queue of port 2 overflows, the device sends a request to
Workstation 2 to include a small break in the sending transmission.
Flow control with a half duplex link
In the example
tion 2 and the device.
Before the send queue of port 2 overflows, the device sends data back so
that Workstation 2 detects a collision and interrupts the sending process.
Basic Configuration L2P
Release 4.2 07/08
Port 1
Port 4
Switch
Port 2
Port 3
Workstation 2
(see fig. 32)
there is a full duplex link between Workstation
(see fig. 32)
there is a half duplex link between Worksta-
Workstation 3
Workstation 4
7.5 Flow control
123

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents