PREPARATION OF TOOLS AND MEASURING
EQUIPMENT
Be sure that all necessary tools and measuring equipment are
available before starting any work activity.
47U0GX-004
SPECIAL TOOLS
Use special tools when they are required.
47U0GX-005
REMOVAL OF PARTS
While correcting a problem, try also to determine its cause.
Begin work only after first learning which parts and subassem
blies must be removed and disassembled for replacement or
repair.
47U0GX-006
DISASSEMBLY
If the disassembly procedure is complex, requiring many parts
to be disassembled, all parts should be disassembled in a way
that will not affect their performance or external appearance,
and be identified so that reassembly can be performed easily
and efficiently.
DISASSEMBLY
1. Inspection of parts
Each part when removed should be carefully inspected for
malfunctioning, deformation, damage, and other problems.
FUNDAMENTAL PROCEDURES
G
G—3