Coolant Inlet Pipe and Bypass Pipe
1. Install the coolant inlet pipe.
Tightening torque:
19—25 Nm (1.9—2.6 m-kg, 14—19 ft-lb)
2. Apply vegetable oil to the O-ring.
3. Install the coolant bypass pipe.
Tightening torque:
37—63 Nm (3.8—6.4 m-kg, 27—46 ft-lb)
Engine Hanger
Install the front and rear engine hangers.
Tightening torque:
19—30 N m (1.9—3.1 m-kg, 14—22 ft-lb)
76G01A-092
1B—71