55.
NOTE
Check the insulation retaining brack­
et is correctly positioned, then refit
the control unit by carrying out re­
moval instructions in reverse order.
Operation sequence for fitting control unit
earth lead braid
4. Proceed as follows to fit the control unit
earth lead braid: insulation
retaining
bracket (1) -
Earth braid (2) - Screw (3).
Tighten bolt (3) to a torque of 0.8
daNm. Pass the earth terminal be­
tween the two anti-rotation tabs on
the sound insulation retaining brack­
et.
NOTE After the operation, check the system
using a FIA T/LANCIA TESTER or other
diagnostic tool.
Copyright Fiat Auto
11-98 - Supersedes previous version
11 fj/11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bravo

Table of Contents