Time Required For Each Processing Included In Scan Time - Mitsubishi 00JCPU User Manual

Q series programmable controller
Table of Contents

Advertisement

10.1.2Time required for each processing included in scan time

This section describes how to calculate the processing and execution time described in Section 10.1.1.
(1) I/O refresh time
The I/O refresh time is time required for refreshing I/O data to/from the following modules mounted on the main
base unit and extension base units.
• Input module
• Output module
• Intelligent function module
Calculation method
Use the following expression to calculate the I/O refresh time.
(I/O refresh time) = (number of input points/16)
For N1 and N2, refer to Table10.1.
CPU module
Q00JCPU
Q00CPU
Q01CPU
Q02CPU
Q02HCPU, Q06HCPU,
Q12HCPU, Q25HCPU
Q02PHCPU, Q06PHCPU,
Q12PHCPU, Q25PHCPU
Q12PRHCPU, Q25PRHCPU
Remark
The number of available base units differs depending on the CPU module.
QCPU User's Manual (Hardware Design, Maintenance and Inspection)
10 - 6
Table10.1 I/O refresh time
Q3
B, Q3
SB,
Q5
B, Q6
Q3
RB, Q3
DB
N1
N2
N1
2.05 s
1.25 s
2.95 s
2.00 s
1.20 s
2.75 s
1.95 s
1.15 s
2.70 s
2.2 s
1.3 s
2.9 s
1.7 s
1.3 s
2.4 s
N1 + (number of output points/16)
B, Q6
Q6
WRB
RB
N2
N1
N2
2.20 s
-
-
2.05 s
2.00 s
2.1 s
-
-
-
-
2.1 s
2.4 s
2.1 s
N2
QA6
QA1S5
B,
QA6ADP + A5
QA1S6
B
QA6ADP + A6
N1
N2
N1
-
-
-
4.9 s
3.9 s
5.6 s
4.3 s
3.9 s
5.0 s
-
-
-
B,
B,
B
N2
-
4.8 s
4.8 s
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents