8:

Install EMU Cables

In this section, you will connect the Base Unit CPU to the Environmental Monitor Unit
(EMU) mounted in each enclosure unit.
Figure #4

EMU Cable on Base Unit Installation

1.
Install the Base Unit EMU Cable.
Short Male/Male (M/M) serial cable
n
Start at EMU left side EXT1 port
n
Connect to CPU I/O Panel Serial Port 1.
n
Connect Base Unit to First Expansion Unit
n
Chapter #1 - Installation - Rack Mounting Your NAS 6000