Installing The Server On L-Shaped Guide Rails - Huawei RH2288H V3 User Manual

Hide thumbs Also See for RH2288H V3:
Table of Contents

Advertisement

RH2288H V3 Server
User Guide
Before installing a server, check that the guide rails of the cabinet are level,
smooth, and not deformed. This ensures surface contact between the server and
the guide rails and even weight distribution. You are advised to use the guide rails
delivered with the server to ensure even weight distribution.
The following tools are available:

3.4.1 Installing the Server on L-Shaped Guide Rails

L-shaped guide rails are designed for Huawei cabinets.
Procedure
Step 1 Install the floating nuts.
1.
Issue 46 (2022-12-28)
Additional servers are required in a cabinet for capacity expansion.
A faulty server needs to be replaced with a new RH2288H V3.
A different rack server needs to be replaced with the server.
A server component needs to be maintained.
NO TICE
ESD wrist strap or ESD gloves
Screwdriver
Floating nut hook
Determine the positions for installing the floating nuts according to the
installation plan.
NO TE
The floating nuts and screws are used together to secure the server.
The middle of two adjacent square holes with smaller spacing is the boundary of two
Us. See
Figure
3-3. The boundary lines are used as the reference for installation
position.
Copyright © Huawei Technologies Co., Ltd.
3 Installing and Removing the RH2288H V3
84

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r003

Table of Contents