3.4.2 Installing the Server on Adjustable Guide Rails

Adjustable guide rails are designed for cabinets with a distance of 543.5 mm to
848.5 mm (21.40 in. to 33.41 in.) between the front and rear mounting bars.
Procedure
Step 1 Install the guide rails.
1.
2.
3.
Issue 46 (2022-12-28)
When the two mounting ears of the RH2288H V3 come into contact with the
mounting bars on the cabinet, tighten the captive screws on the mounting
ears to secure the RH2288H V3. See (2) in
Place a guide rail horizontally in the planned position and keep the guide rail
in contact with the mounting bars in the cabinet. Hook the guide rail to the
cabinet. See step (1) in
NO TE
The three holes in each mounting ear of a guide rail should be within 1U boundary
lines.
Figure 3-7 Installing an adjustable guide rail
Insert the plugs delivered with server into the middle holes at the front and
rear of the guide rail to secure it. See step (2) in
(Optional) Install an M6 screw in the hole underneath at the rear of the guide
rail to secure it. See step (3) in
Copyright © Huawei Technologies Co., Ltd.
3 Installing and Removing the RH2288H V3
Figure
Figure
3-7.
Figure
3-7.
3-6.
Figure
3-7.
87