3.3 Unpacking the Chassis

The following tools must be available before the operation:
Procedure
Step 1 Check whether the package and seals are in good condition.
Step 2 Use a box cutter to cut the pressure-sensitive adhesive tape on the package, and
open the package.
Exercise caution when using a box cutter to avoid personal injury or equipment
damage.
Step 3 Check the components against
from oxidation, corrosion, and damage.
Table 3-2 Shipped items
No.
1
2
3
----End

3.4 Installing the Server

This section describes how to install a server on L-shaped guide rails, adjustable
guide rails, and holding rails. Choose an installation method based on site
conditions.
Install a server if:
Issue 46 (2022-12-28)
Air filters installed on cabinet doors.
AC power supplied from the rear of the cabinet.
Protective gloves
ESD gloves or ESD wrist strap
Box cutter
NO TE
If the package is damaged (for example, the package is soaked or deformed, or the seals or
pressure sensitive adhesive tape is unsealed), fill in the
CA UTION
Description
Documentation bag that contains a warranty card, and a Quick
Start Guide
A pair of guide rails
One rack server
Copyright © Huawei Technologies Co., Ltd.
3 Installing and Removing the RH2288H V3
Cargo Problems Feedback Form .
Table 3-2
and ensure that they are intact and free
83

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r003

Table of Contents