Procedure
Step 1 Install the holding rails.
1.
2.
3.
4.
5.
6.
Step 2 Install the server.
1.
Issue 46 (2022-12-28)
Holding down the release latch at the front end of the holding rail, pull out
the locking plate by its hook. See (1) and (2) in
Figure 3-9 Installing a holding rail
Aligning the screws on the back end of the holding rail with the mounting
holes of the cabinet, insert the rail into position so that the latch clicks into
place. See (3) in
Figure
Aligning the top screw on the front end of the holding rail with the level
mounting hole of the cabinet, insert the rail into position. See (4) in
3-9.
Push back the locking plate by its hook until the release latch clicks into
place. See (5) in
Figure
(Optional) Secure the back end of the rail with an M6 screw through the
corresponding mounting hole in the cabinet. See (6) in
Install the other holding rail using the same method.
Pull out the inner rails as far as they will go. See
Copyright © Huawei Technologies Co., Ltd.
3 Installing and Removing the RH2288H V3
3-9.
3-9.
Figure
3-9.
Figure
3-9.
Figure
3-10.
Figure
89

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r003

Table of Contents