Ramp Loading Mechanism Maintenance - Agilent Technologies E5035A Operation Manual

Hard disk read/write test system
Table of Contents

Advertisement

Ramp Load
Ramp Load

Ramp Loading Mechanism Maintenance

It requires to check a rod of the air cylinder every 10,000 head down action. If it is stained,
clean the rod with cloth and grease the rod.
It requires to check a floating joint of the air cylinder every 50,000 head down action. If it
is stained, clean the rod with cloth and grease the floating joint.
The air cylinder on the ramp loading mechanism has life span due to fatigue and it requires
replacement every 1,000,000 head down action.
Tools Required
Parts Required
Table 6-65
Parts Number for Air Cylinder
Air Cylinder
Cleaning Procedure
For details, refer to the E5013A service manual.
Replacement Procedure
For details, refer to the E5013A service manual.
440
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
2.0 mm Hex Key
Miniature Driver
Diagonal Cutting Plier
Silicon Grease
Lint Free Cloth
Description
Part Number
TBA
Appendix H

Advertisement

Table of Contents
loading

Table of Contents