Juniper M40E Hardware Manual page 220

Multiservice edge router
Hide thumbs Also See for M40E:
Table of Contents

Advertisement

M40e Multiservice Edge Router Hardware Guide
192
All manuals and user guides at all-guides.com
CAUTION: Do not leave a fiber-optic transceiver uncovered except when
inserting or removing cable. The safety cap keeps the port clean and
prevents accidental exposure to laser light.
CAUTION: Avoid bending fiber-optic cable beyond its minimum bend
radius. An arc smaller than a few inches in diameter can damage the cable
and cause problems that are difficult to diagnose.
If you are transferring any PICs to a different FPC, remove them while the FPC is still
6.
installed:
Unscrew the thumbscrews at the top and bottom of the PIC faceplate
a.
simultaneously and at about the same rate (unscrewing the two screws alternately
or at very different rates can cause the PIC to become lodged in the FPC slot,
making it difficult to turn the screws).
Slide the PIC out of the slot and immediately place it on an antistatic mat or in an
b.
electrostatic bag.
Loosen the thumbscrew at each end of the FPC, using a Phillips screwdriver if
7.
necessary.
Pull the ends of the ejector levers, which are adjacent to the thumbscrews, away from
8.
the face of the FPC until they are nearly perpendicular to it.
Grasp the top and bottom flanges of the card carrier and slide the FPC about halfway
9.
out of the card cage.
Place one hand around the front of the FPC (the PIC housing) and the other hand
10.
under it to support it. Slide the FPC completely out of the chassis, and place it on the
antistatic mat or in the electrostatic bag.
CAUTION: The weight of the FPC is concentrated in the back end. Be
prepared to accept the full weight—up to 15 lb (6.8 kg)—as you slide the
FPC out of the chassis.
When the FPC is out of the chassis, do not hold it by the ejector levers, bus
bars, or edge connectors. They cannot support its weight.
Do not stack FPCs on top of one another after removal. Place each one
individually in an electrostatic bag or on its own antistatic mat on a flat,
stable surface.
If you are not reinstalling a FPC into the emptied FPC slot within a short time, install
11.
a blank FPC panel over the slot to maintain proper airflow in the FPC card cage.
Copyright © 2010, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents