Juniper M40E Hardware Manual page 102

Multiservice edge router
Hide thumbs Also See for M40E:
Table of Contents

Advertisement

M40e Multiservice Edge Router Hardware Guide
74
All manuals and user guides at all-guides.com
Move the shipping crate to a staging area as close to the installation site as possible,
1.
but where you have enough room to remove the system components. While the chassis
is bolted to the pallet, you can use a forklift or pallet jack to move it.
Position the crate so that the arrows are pointing up.
2.
Twist open the locking tabs that secure the crate to the pallet and the front panel to
3.
the side panels.
Remove the front panel from the crate, then lift the top and sides off the pallet as a
4.
unit. See Figure 40 on page 75.
Remove the plastic cover, then the foam and Quick Start that are sitting on top of the
5.
chassis. The installation handle and accessory box are embedded in cutouts in the
foam.
Open the accessory box and verify the contents against the parts inventory on the
6.
label attached to the box.
Verify the chassis components received against the packing list included with the
7.
router. A generic parts inventory appears in "Verifying the M40e Parts Received" on
page 75.
Use a 1/2-in. open-end or socket wrench to loosen and remove the bolts on the brackets
8.
that attach the chassis to the pallet. If a 1/2-in. tool is not available, use an adjustable
wrench rather than a fixed-size metric wrench.
Use a Phillips screwdriver to loosen the screws that secure the brackets to the sides
9.
of the chassis, and remove the brackets. Store the brackets, screws, and bolts inside
the accessory box.
Save the shipping crate, packing materials, and pallet in case you later need to move
10.
or ship the router.
Copyright © 2010, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents