Toshiba B-EX6 Series Maintenance Manual page 36

Table of Contents

Advertisement

4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT
11. Align the screw holes in the Rewinder Ass'y with those in the printer main frame, and secure the
Rewinder Ass'y with the five ST-3x6 screws.
ST-3x6 Screw
ST-3x6 Screw
12. Align the screw holes in the Core Shaft Support with those in the printer base frame, and secure the
Core Shaft Support with the five M-4x4 screws.
4.3 PEEL-OFF MODULE (B-EX906-H-QM-R)
M-4x4 Screw
Core Shaft Support
4-19
ST-3x6 Screw
ST-3x6 Screw
Rewinder Ass'y
EO18-33031

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents