5. Install the four lock links to the top of the front frame using eight screws.
Attaching the Network Analyzer to the Test Set
6. Place the network analyzer on top of the test set ensuring that the front frame of the
network analyzer is positioned slightly forward of the lock links that are attached to the
the test set. Then slide the network analyzer back so the lock links engage the front frame
of the analyzer.
Chapter 3
Using the Multiport Test System
How to Set Up the Multiport Test System Hardware
21