Pentair FLECK 3150 NXT Installer Manual page 85

Hide thumbs Also See for FLECK 3150 NXT:
Table of Contents

Advertisement

a) Set the day of the month with
b) Press
next parameter.
6.2.4
Basic programming
Info
Menus are displayed in a defined and incremental order. Depending of selected system
or regeneration type, some of this parameters may not be visible. Editable or selected
value or digit is marked by one or two triangles.
6.2.4.1
Basic programming mode chart
Parameter
DAY
OVERRIDE /
TIME DRIVEN
REGENERATIO
N TIME
HARDNESS
VOLUME
REMAINING
PUSH
SETTINGS
6.2.4.2
Day Override / Time-driven
Set the maximum number of days between two regenerations, regardless from the
volume of water treated.
Ref. MKT-IM-010 / C - 18.10.2019
Installer manual Fleck 3150 NXT/NXT2 - Programming
to validate the selection and advance to the
Options
OFF to 99
4, 8, 12, 16,
20
1 to 1999
00:00 to
23:59
1 to 1999
Gram as CaCO
equivalent if hardness
unit is mg/L
°FTH if hardness unit
°dH if hardness unit is
°eH if hardness unit is
0 to 4820
ON
OFF
and
:
Definition
Day
Days between regenerations only
for metered regeneration types.
Hour
Hours or days between
regenerations only for time clock
regeneration type.
Day
Hour
Regeneration time will not appear
when day override/time driver is
by hours for time clock or OFF for
meter immediate regeneration
type.
Those screens will only display
3
when regeneration type selected
is softener meter immediate or
delayed.
is °FTH
°dH
°eH
Liter
(default)
Only displayed for multi unit
systems.
-
Note
85 / 182

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 3150 nxt2

Table of Contents