Pentair FLECK 3150 NXT Installer Manual page 128

Hide thumbs Also See for FLECK 3150 NXT:
Table of Contents

Advertisement

Installer manual Fleck 3150 NXT/NXT2 - Operation
• the timer advance to regeneration cycle step #5:
• cycle step #5, time remaining 15 min:
8.1.3
LED status
Blue
Blue flashing
Green
Green flashing
Red
All LED flashing
8.2
Recommendations
• Use only regeneration salts designed for water softening in accordance with
EN973;
• for optimal system operation, the use of clean salt, free from impurities, is
recommended (for example salt pellets);
• do not use ice melt, block, or rock salts;
• the sanitizing process (both with liquid and electrochlorination) may introduce
chlorine compounds which may reduce the lifetime of the ion exchange resins.
Refer to the technical guides for resins in common use, providing necessary
checks on the system.
8.3
Manual regeneration
Mandatory
The controller must be in service in order to enable this procedure.
8.3.1
Manual delayed regeneration
a) Press
ð The regeneration starts on the programmed regeneration time. See chapter
Regeneration start time [}Page 74] for NXT and chapter Regeneration time
Page 106] for NXT2;
ð For NXT: The blue LED flashes and the letters RGQ take place on the valve
state;
ð For NXT2: The blue LED and the symbol
128 / 182
→ the unit is in service and no errors detected;
→ the unit is in service with a queued regeneration;
→ the unit is in regeneration;
→ the unit is in standby position, in a multi tank system;
→ the controllers have detected an error;
→ delayed unlock, only forNXT2.
(for NXT ) or
(for NXT2 ) once for delayed regeneration.
During transition to
cycle:
Once in position:
on the valve state flash.
Ref. MKT-IM-010 / C - 18.10.2019
[}

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 3150 nxt2

Table of Contents