Pentair FLECK 3150 NXT Installer Manual page 63

Hide thumbs Also See for FLECK 3150 NXT:
Table of Contents

Advertisement

6.1.4.4
Regeneration days override
Set the maximum number of days that the valve is in service without regenerating,
regardless from the volume of water used.
Info
For a timeclock valve, this value must be set. For metered valves, calendar override
parameter would trigger a regeneration only if the volumetric control did not start a
regeneration before calendar override period elapsed. Each volumetric regeneration
happening reset the calendar override delay.
a) Adjust the number of days with
b) Press
next parameter.
ð Can be adjusted from:
1 to 99 days for timeclock regeneration;
OFF to 99 days for metered regeneration.
6.1.4.5
Regeneration start time
Set the time for regeneration start.
Info
It must be set when the regeneration mode programmed is timeclock or with a
metered calendar override.
a) Adjust the time of regeneration with
b) Press
service.
Ref. MKT-IM-010 / C - 18.10.2019
Installer manual Fleck 3150 NXT/NXT2 - Programming
to validate the selection and advance to the
to validate the selection and return to
,
and
.
Without calendar
override.
override every 3 days.
,
and
.
Regeneration at 2:00 am.
63 / 182

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 3150 nxt2

Table of Contents