Pentair FLECK 3150 NXT Installer Manual page 127

Hide thumbs Also See for FLECK 3150 NXT:
Table of Contents

Advertisement

• lead valve in regeneration queued in interlock system:
• window lock activated in serial regeneration system:
• remote lock activated in serial regeneration system:
8.1.2.2
During regeneration
During regeneration the display shows the cycle number and the time remaining for
that cycle. The countdown for the time remaining starts only when the valve is in the
cycle displayed.
• The timer advance to regeneration cycle step #1:
• cycle step #1, time remaining 10 min:
• the timer advance to regeneration cycle step #2:
• cycle step #2, time remaining 1 hour 20 min:
• the timer advance to regeneration cycle step #3:
• cycle step #3, time remaining 50 min:
• the timer advance to regeneration cycle step #4:
• cycle step #4, time remaining 2 hours 40 min:
Ref. MKT-IM-010 / C - 18.10.2019
Installer manual Fleck 3150 NXT/NXT2 - Operation
During transition to
cycle:
Once in position:
During transition to
cycle:
Once in position:
During transition to
cycle:
Once in position:
During transition to
cycle:
Once in position:
127 / 182

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 3150 nxt2

Table of Contents