Pentair FLECK 3150 NXT Installer Manual page 3

Hide thumbs Also See for FLECK 3150 NXT:
Table of Contents

Advertisement

4.1.1
Injector/DLFC/BLFC-Valve configuration...........................................................
4.2
Sizing a softener (single unit) ..................................................................... 27
4.2.1
Parameters to be considered .............................................................................
4.2.2
Determining the required volume of resin .........................................................
4.2.3
Resin exchange capacity and capacity of the unit ..............................................
4.2.4
Valve configuration..............................................................................................
4.2.5
Cycle time calculation .........................................................................................
4.3
Salt amount definition ................................................................................. 34
4.4
1800 Injector flow rates............................................................................... 34
5
Installation ...................................................................................... 37
5.1
Warnings...................................................................................................... 37
5.2
Safety notices for installation ..................................................................... 37
5.3
Installation environement ........................................................................... 38
5.3.1
General ................................................................................................................
5.3.2
Water ...................................................................................................................
5.3.3
Electrical .............................................................................................................
5.3.4
Mechanical ..........................................................................................................
5.4
Integration constraints................................................................................ 39
5.5
Valve connection to piping........................................................................... 40
5.5.1
Top-mounted valve installation ..........................................................................
5.5.2
Side-mounted valve installation .........................................................................
5.6
Block diagram and configuration example................................................. 43
5.7
System types ............................................................................................... 44
5.7.1
Single valve (System #4) .....................................................................................
5.7.2
Multiple valves, parallel interlock system (System #5) .....................................
5.7.3
5.7.4
Duplex alternating immediate system (System #7) ...........................................
5.7.5
5.7.6
5.7.7
Multiple valves, system on-demand (System #14).............................................
5.8
Electrical connections................................................................................. 52
5.8.1
NXT controller connections ................................................................................
5.8.2
NXT2 controller connections ..............................................................................
5.8.3
NXT controller connections for multiple valves .................................................
5.8.4
NXT2 controller connections for multiple valves ...............................................
5.9
Bypassing .................................................................................................... 57
5.10
Drain line connection .................................................................................. 57
5.11
Overflow line connection............................................................................. 58
5.12
Brine line connection .................................................................................. 59
6
Programming .................................................................................. 60
6.1
NXT controller ............................................................................................. 60
6.1.1
Display .................................................................................................................
Ref. MKT-IM-010 / C - 18.10.2019
Installer manual Fleck 3150 NXT/NXT2 - Table of Contents
27
27
28
29
31
31
38
38
38
39
40
42
45
45
46
46
47
47
48
53
54
55
56
60
3 / 182

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 3150 nxt2

Table of Contents