Nortel Succession 1000 Installation And Configuration Manual page 46

Signaling server
Table of Contents

Advertisement

Page 46 of 116
Hardware installation
553-3001-212
Standard 1.00
a.
Turn on the power for the maintenance terminal.
b.
Enter setup mode by pressing the <SETUP> key located on the top
row of the special function keys. The terminal screen displays the
current setup values.
c.
Change the value in each field on each setup screen as necessary.
Use the keys listed in Table 8 to view and change setup values.
Table 8
SDI key function
Key
Arrow key
<Enter>
<Next Screen>
<Prev Screen>
d.
Save changes by returning to the General setup screen, moving the
cursor to the Saved field, and pressing <Enter>.
To configure the maintenance terminal, refer to "Maintenance terminal
configuration parameters" on
5
Connect the Succession Signaling Server power cord.
a.
Check that the power cord is the type required in the region where
the Succession Signaling Server is used.
Do not modify or use the supplied AC power cord if it is not the correct
type. Refer to Succession 1000 System: Installation and
Configuration (553-3031-210) for a detailed power cord description.
b.
Attach the female end of the power cord to the mating AC power
receptacle on the left side of the Succession Signaling Server's back
panel. See Figure 12 on
cord into the AC power source (wall outlet).
October 2003
Function
Move from field to field
Scroll through possible values or cause
requested action to occur (depends on type of
field)
Move to next setup screen
Move back to last screen
page
49.
page
44. Plug the male end of the AC power

Advertisement

Table of Contents
loading

This manual is also suitable for:

Succession 1000m

Table of Contents