Nortel Succession 1000 Installation And Configuration Manual page 22

Signaling server
Table of Contents

Advertisement

Page 22 of 116
Overview
Figure 4
Maintenance port location on the front and rear of the Succession Signaling Server
Front port
553-3001-212
Standard 1.00
The TLAN port (P2) connects the Succession Signaling Server to a
Layer 2 Switch port on the TLAN subnet.
The ELAN port (P1) connects the Succession Signaling Server to a
Layer 2 Switch port on the ELAN subnet.
The maintenance port connects the Succession Signaling Server to a
maintenance and administration terminal.
The remaining ports are not used for any function. Do not plug any
device into these ports.
Maintenance ports
The Succession Signaling Server has two maintenance ports, as shown in
Figure 4 on
page
22. Both ports can be used for maintenance. The console
port is used during Succession Signaling Server software installation and
basic configuration.
October 2003
553-AAA0107
Maintenance/
Console port
553-AAA0104

Advertisement

Table of Contents
loading

This manual is also suitable for:

Succession 1000m

Table of Contents