Nortel Succession 1000 Installation And Configuration Manual page 34

Signaling server
Table of Contents

Advertisement

Page 34 of 116
Hardware installation
Readiness checklist
553-3001-212
Standard 1.00
Before starting the installation, complete the checklist in Table 7.
Table 7
Readiness checklist
Have you:
Read all safety instructions in Succession 1000 System:
Installation and Configuration (553-3031-210)?
Received all equipment?
Made sure the area meets all environmental requirements?
Checked for all power requirements?
Checked for correct grounding facilities?
Obtained the following:
• screwdrivers
• an ECOS 1023 POW-R-MATE or similar type of test meter
• appropriate cable terminating tools
• a computer to be connected directly to the Succession
Signaling Server by a DTE—DTE null modem cable, with:
— teletype terminal (ANSI-W emulation, serial port,
19 200 bps) for the Succession Signaling Server
— a web browser for Element Manager (configure cache
settings to check for new pages every time and to empty
the cache when the browser is closed)
Prepared the network data as suggested in Data Networking for
Voice over IP (553-3001-160) and Succession 1000 System:
Planning and Engineering (553-3031-120)?
October 2003
!

Advertisement

Table of Contents
loading

This manual is also suitable for:

Succession 1000m

Table of Contents