Toro Reelmaster 6500–D Service Manual page 179

Hide thumbs Also See for Reelmaster 6500–D:
Table of Contents

Advertisement

28. Put the metering package, drive plate side first, into
the metering ring (Fig. 109). Revolve the input shaft or
metering package until the hole in the drive plate en-
gages the end of the input shaft and the drive plate is
seated on the thrust bearing. When properly seated, the
metering package will be below the surface of the meter-
ing ring.
29. Apply clean multi–purpose grease on the new com-
mutator seal and put it into the commutator cover seal
groove (Fig. 110). The rubber portion (the softer side) of
the seal with the yellow mark must be put into the seal
groove.
30. Apply clean multi–purpose grease to the metering
ring seal ring. Put the seal ring into the metering ring seal
ring groove (Fig. 111).
Reelmaster 6500–D/6700–D
Page 4 – 91
Figure 109
Figure 110
Figure 111
Hydraulic System

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 6700 d

Table of Contents