Toro Reelmaster 6500–D Service Manual page 176

Hide thumbs Also See for Reelmaster 6500–D:
Table of Contents

Advertisement

20. Put another piece of the 0.007 in. (0.18 mm) shim
stock between the drive plate and each of the three
pieces of shim stock already in place. Lift the metering
ring and metering package and remove the wood block.
Push the metering package and shims into the metering
ring until the drive plate and shims are at least flush with
the metering ring (Fig. 100).
21. Reverse the metering ring and metering package as
a unit on a flat surface. Push down on the metering pack-
age until the drive plate is on the flat surface. Be sure the
cap screws are loose enough to allow the commutator
ring and drive plate to align themselves concentrically in
the metering ring bore. Gradually tighten the eleven cap
screws, following the sequence shown in Figure 101 at
least twice until a final torque of 11 – 13 in–lb (1.24 – 1.47
Nm) is reached (Fig. 101 and 102). Remove the meter-
ing package and shims from the metering ring. Discard
the shims.
Use care and eye protection when adding and
removing shims from the metering ring as the
shims will be under spring tension and could
fly into the air and cause injury.
Hydraulic System
CAUTION
Page 4 – 88
Figure 100
Figure 101
Figure 102
Reelmaster 6500–D/6700–D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 6700 d

Table of Contents