Toro Reelmaster 6500–D Service Manual page 177

Hide thumbs Also See for Reelmaster 6500–D:
Table of Contents

Advertisement

22. Insert the LARGE tang of the drive link into the slot
in the rotor (Fig. 103).
IMPORTANT: An incorrect (reversed) assembly of
the drive link will prevent the assembly of the hex
drive.
23. Grasp the drive link and rotate the metering package
by hand to make sure the parts do not bind (Fig. 104).
The rotor should orbit inside the stator. If they bind, dis-
assemble the metering package, correct the cause and
repeat the assembly and concentricity procedures.
24. Apply clean multi–purpose grease to the metering
ring seal ring. Put the seal ring into position in the meter-
ing ring seal groove opposite to the end with the align-
ment pin holes. Stack the metering ring into place, over
the four bolts, with the seal ring towards the upper cover
plate. Make sure an alignment pin hole on the metering
ring is in line with and on the same side as the alignment
groove on the side of the upper cover plate (Fig. 105).
This is required so the other components can be aligned
correctly.
IMPORTANT: Make sure the seal ring does not slip
from position.
Reelmaster 6500–D/6700–D
Page 4 – 89
Figure 103
Figure 104
Figure 105
Hydraulic System

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 6700 d

Table of Contents