Test Procedures - Mitel SX-200 Practices

Hide thumbs Also See for SX-200:
Table of Contents

Advertisement

El .
SUPERSET 3
Description
Wall-Mounting
the SUY9SSH3 Telephone
Wall-Mounting
Instructions
4.5
SUPERSET
3 telephone
may be attached
to a wall-mount
assembly
and plugged
into a modular
wall jack. The wall-mount
assembly
can be ordered
through
normal
distribution
channels.
Test Procedures
:
\ 4.6
Perform the test procedures
listed in Table 4-2 as operational
tests when
installing
a
SUPERSET
3 telephone
after initial installation
of a system.
Whenever
a SUPERSET
3 telephone
is connected
to an operating
system,
or the
system has just been powered
up, the test is run automatically
and the following
results
appear,
If any test fails, verify that the system
is installed correctly
and is powered
up.
Table
4-2
SUPERSET
3 Telephone
Power-n
Test
TEST
LED1
LED2
LED3
TIMING
1
on
on
on
1 second
2
flashing
Off
Off
1 O-l 5 seconds
3
Off
Off
Off
steady, if set is on-hook
or
on
Off
Off
steady, if set is off-hook
Note:
If all LEDs turn on steady for more than a few seconds there is an error; check wiring, then try
a known good spare.
If the system
is programmed
to detect
a missing
SUPERSfl
3 telephone,
verify
operation
of this feature
as follows:
. Disconnect
the SUPEWET3
modular
plug.
9 A minor alarm appears
at the console.
l
At the console,
press the ALARM
key; display
indicates
disconnected
telephone.
* At the console,
clear the alarm.
0 Reconnect
the modular
cord to the SUPEFfSfl3
telephone.
9109-09&126-NA
Issue 1
Revision 0
126 4-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents