Perform Engine Maintenance - Perkins Models; Perform Engine Maintenance - Kubota Diesel Models - Genie GS-2669 RT Service Manual

Hide thumbs Also See for GS-2669 RT:
Table of Contents

Advertisement

November 2014
E-5
Perform Engine Maintenance -
Perkins Models
Engine specifications require that this procedure be
performed every 3000 hours.
• Inspect fuel injectors
• Inspect water pump
• Flush coolant system
Required maintenance procedures and additional
engine information is available in the
Perkins 403D-11 Operator's Manual
(Perkins part number SEBU8311-01).
Perkins 403D-11 Operator's Manual
Genie part number
Part No. 229753
131661
GS-2669 RT • GS-3369 RT • GS-4069 RT
Section 3 • Scheduled Maintenance Procedures
CHECKLIST E PROCEDURES
E-6
Perform Engine Maintenance -
Kubota Diesel Models
Engine specifications require that this procedure be
performed every 3000 hours.
• Inspect injection pump
• Inspect injection timing
Required maintenance procedures and additional
engine information is available in the
Kubota D1105 Operator's Manual
(Kubota part number 16622-89166).
Kubota D1105 Operator's Manual
Genie part number
131379
3 - 41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs-4069 rtGs-3369 rt

Table of Contents