SECTION 4
Basic Operations
Starting the Controller
Enter the controller's menu.
1.
Be sure that the basic system components have been connected correctly.
Refer to page 36 (Sec.2).
2.
Turn ON the power supply on the monitor.
3.
Turn ON the power supply to the V530-R160.
The Camera/Monitor setting screen will be displayed.
4.
When using Intelligent Lighting, select LTC20.
V530-R160
68
Operation Manual
V530-R160
VISION MATE
CONTROLLER
Power supply
ESC
TRIG
ENT
Console
SHIFT
CONSOLE
Camera
POWER
Monitor
SYNC