NETGEAR XS708T User Manual page 40

8-port, 12-port, and 16-port 10-gigabit smart managed pro switch
Hide thumbs Also See for XS708T:
Table of Contents

Advertisement

XS708T, XS712Tv2, and XS716T Smart Managed Pro Switch User Manual
6.
Select the appropriate radio button to determine how to configure the network information for
the switch management interface:
Dynamic IP Address (DHCP). Specifies that the switch must obtain the IP address
through a DHCP server.
Dynamic IP Address (BOOTP). Specifies that the switch must obtain the IP address
through a BootP server.
Static IP Address. Specifies that the IP address, subnet mask, and default gateway
must be manually configured. Enter this information in the fields below this radio
button.
7.
If you selected the Static IP Address radio button, configure the following network
information:
IP Address. The IP address of the network interface. The default value is
192.168.0.239. Each part of the IP address must start with a number other than zero.
For example, IP addresses 001.100.192.6 and 192.001.10.3 are not valid.
Subnet Mask. The IP subnet mask for the interface. The default value is
255.255.255.0.
Default Gateway. The default gateway for the IP interface. The default value is
192.168.0.254.
8.
Specify the VLAN ID for the management VLAN.
The management VLAN is used to establish an IP connection to the switch from a
workstation that is connected to a port in the same VLAN. If not specified, the active
management VLAN ID is 1 (default), which allows an IP connection to be established
through any port.
When the management VLAN is set to a different value, an IP connection can be made
only through a port that is part of the management VLAN. Also, the port VLAN ID (PVID)
of the port to be connected in that management VLAN must be the same as the
management VLAN ID.
Note:
Make sure that the VLAN that must be the management VLAN exists. Also
make sure that the PVID of at least one port in the VLAN is the same as
the management VLAN ID. For information about creating VLANs and
configuring the PVID for a port, see
The following requirements apply to the management VLAN:
Only one management VLAN can be active at a time.
When a new management VLAN is configured, connectivity through the existing
management VLAN is lost.
The management station must be reconnected to the port in the new management
VLAN.
9.
Click the Apply button.
Configure VLANs
Configure System Information
40
on page 125.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xs712tv2Xs716t

Table of Contents