7
Maintenance
Prepare the Pump Module for Transport
9
Reconnect the degasser outlet tubings to the MCGV.
Remove the degasser inlet tubings.
11
Carefully insert the protective foam to the front part of
the instrument. Do not damage any tubing or capillary
connections.
180
10
You may keep internal tubing and capillary connections.
Next Steps:
12
Close the doors.
13
For transport or shipment, put the module and accessory
kit to the original shipment box.
1260 Infinity II Flexible Pump User Manual